|
|
![]() TM 11-5920-252-24
3.14.
TESTING PROCEDURE
1. At the SIGNAL ENTRANCE panel, within the shelter, place all the CHANNEL
switches to the BINDING POST position (up).
2. Place the TS-3760/G near the SIGNAL ENTRANCE box outside the shelter
so that the test lead can reach all of the binding posts within the SIGNAL
ENTRANCE box.
3-11
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |