Click here to make tpub.com your Home Page

Page Title: INSTALLATION PROCEDURE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 11-5920-252-24
3-10.
INSTALLATION PROCEDURE
1.
Turn off all the shelter communications equipment. The turn off procedures can be found in the shelter
configuration maintenance manual. Refer to DA Pam 310-4 to obtain the technical manual (CM)
number.
2.
Disconnect the cable connectors from J1, J2, and J3. They are usually labeled CHANNEL 1-4, 5-8, and
9-12.
NOTE
When more than 12 channels are used in the shelter an additional arrester will be needed. Installation
procedures for each arrester are the same.
3.
Remove the SIGNAL ENTRANCE panel access panel with the Phillips screwdriver. Retain the access
panel and screws.
4.
Remove and discard the three connector retaining nuts holding connectors J1.
J2 and J3 to the
SIGNAL ENTRANCE Panel.
3-6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business