Click here to make tpub.com your Home Page

Page Title: CHAPTER 1 INTRODUCTION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 11-5895-878-14&P
CHAPTER 1
INTRODUCTION
Section I. GENERAL
maintenance levels are listed in and prescribed by TM
1-1. Scope
38-750.
a. This manual describes the patch and test facility
(P&T) of the technical control facility (TCF) at the
b. Report of Packaging and Handling Deficiencies.
Pentagon, Washington, DC.  Included are description
Fill  out  and  forward  DD  Form  6  (Packaging
and data; station application and equipment function;
Improvement  Report)  as  prescribed  in  AR  700-
station operation; and maintenance instructions.
58/NAVSUPINST 4030.29/AFR 71-13/MCO P4030.29A,
and DLAR 4145.8.
b. Publications that cover individual equipment
and systems used with the P&T are listed in appendix A.
c. Discrepancy in Shipment Record (DISREP) (SF
Appendix B defines abbreviations used in this technical
361).  Fill out and forward Discrepancy in Shipment
manual; appendix C provides a listing of P&T
Record (DISREP) (SF 361) as prescribed in AR 55-
components; and appendix D is a site repair parts
38/NAVSUPINST
4610.33B/AFR
75-18/MCO
listing.
P4610.19C and DLAR 4500.15.
d. Station Operation and Maintenance. Also use
1-2. Indexes of Publications
forms and records in accordance with instructions in the
a. DA Pam 310-4. Refer to the latest issue of DA
station Standard Operating Procedures (SOP).
Pam 310-4 to determine whether there are new editions,
changes or additional publications pertaining to the
1-4. Administrative Storage
equipment.
This P&T is expected to be incontinuous operation.
Therefore,  procedures,  forms  and  records,  and
b. DA Pam 310-7.  Refer to DA Pam 310-7 to
inspections required during periods of administrative
determine whether there are modification work orders
storage are not applicable.
(MWO's) pertaining to the equipment.
1-5. Destruction of Army Materiel
1-3. Forms and Records
Destruction of Army materiel to prevent enemy use shall
a. Reports of Maintenance and Unsatisfactory
be as prescribed in TM 750-244-2.
Equipment.  Maintenance forms, records, and reports
which are to be used by maintenance personnel at all
Section II. DESCRIPTION AND DATA
Access is provided to both the black (encrypted) and the
1-6. Purpose and Use
red (clear) sides of the circuits.
a. The Pentagon technical control facility is the
main Army TCF serving the Washington DC area. The
1-7. Tabulated Data
facility provides many high priority circuits to and from
NOTE
various local government users to locations scattered
See  individual  technical  manuals
throughout the free world and to the Kremlin. Users and
connecting sites often change. Typical Pentagon users
for
technical
are shown in figure 1-1.
characteristics of installed facility
components.
b. The patch and test facilities of the TCF provide
access to each circuit for monitoring, rerouting, and
testing.
1-1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business