Click here to make tpub.com your Home Page

Page Title: Section IX. MAINTENANCE OF VOLTAGE REGULATOR MONITOR PANEL SM-D-936692
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 11-5895-1123-34
a. Replacement of the Matrix Patch Board.
(1)
(1) Remove the Central Distribution Frame (CDF)
outlined in paragraph 327 below.
from the side of rack as outlined in paragraph 325 above.
b. Replacement of Multipin Connectors.
(2) Place the CDF front down on a working surface.
(1) Remove the Central Distribution Frame (CDF)
(3) Loosen the four captive quarterturn fasteners (1)
from the side of rack 8 as outlined in paragraph 325
holding the slide panel on the side of the CDF to the
above.
CDF.
(2) Remove the four screws holding the clear plastic
(4) Pull on the slide panel handle and extend the
shield over the terminal boards and remove the shield.
slide panel from the CDF.
(3) Remove the 26 screws holding the front panel to
(5) Remove the five screws and nuts (2) which hold
the CDF and remove the front panel.
the frame of the bottom slide rail to the lower part of the
(4) Loosen the four captive quarter turn fasteners on
matrix patch board.
the side slide panel and extend the panel outwards.
(6) Remove the bottom slide rail and frame (3) from
(5) Follow the procedure for replacement of multipin
the CDF.
connectors as outlined in paragraph 36b above.
(7) Tag and unsolder the leads connected to the
(6) Release the slide latches and push the panel
solder terminals on the matrix patch board.
back into CDF and tighten the fourquarter turn fasteners
(8) Remove the two bolts (4) which hold the two
to secure it in place.
cable retractor arms to the matrix patch board.
(7) Mount the front panel on the CDF and secure it
(9) Remove the 10 mounting screws and nuts (5)
in place with the 26 mounting screws.
that hold the matrix patch board to the slide panel frame
(8) Mount the clear plastic shield over the terminal
and remove the matrix patch board from the CDF.
boards and secure it in place with the four mounting
(10) Insert the replacement matrix patch board slide
screws.
panel frame and secure it in place with the 10 mounting
(9) Mount the CDF on the side of rack 8 as outlined
screws and nuts (5) on the top and right end of the
in paragraph 327 below.
matrix patch board. (Do not insert the bottom slide rail
3-27. Replacement of the Central Distribution Frame
and frame).
SMF935726
(11) Attach the two cable retractor arms to the
WARNING
replacement matrix patch board by inserting and
Two persons are required to perform
tightening the two bolts (4) into the mounting holes on
this procedure due to the bulk of the
the matrix patch board.
unit, a. Be sure the ac power to the CSS
(12) Prepare the leads for soldering and using good
is off.
soldering practices solder the leads to the appropriate
b. Position the CDF on the side of rack 8 and
solder terminal on the matrix patch board.
tighten the five captive screws along the top edge to
(13) Insert the bottom slide rail and frame (3) into the
secure it to the rack.
CDF and secure it in place with the five mounting screws
c. Tighten the five captive screws along the bottom
and nuts (2).
edge of the CDF to secure them to the side of the rack.
(14) Release the latches on the slides and push the
d. Connect  the  four  cables  to  the  bottom
slide panel back into the CDF.
connectors on the CDF.
(15) Tighten the fourquarter turn fasteners (1) on the
e. Connect the four cables to the top connectors on
slide panel to secure in place in the CDF.
the CDF.
(16) Mount the CDF on the side of rack 8 as
f. Reenergize the ac power to the CSS.
Section IX. MAINTENANCE OF VOLTAGE REGULATOR
MONITOR PANEL SM-D-936692
NOTE
3-28. Removal of Voltage Regulator Monitor Panel
The voltage regulator monitor panel
(panel) SM-D-936692
testing and repairing procedures require
a. At the power distribution panel, turn the ac power
various degrees of removal; therefore it
off to racks 4, 5, and 6.
should only be completely removed
b. Loosen the four captive screws holding the
when indicated in the procedures.
3-49

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business