Click here to make tpub.com your Home Page

Page Title: PRE-SHOP INSPECTION.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TB 9-289
4. PRE-SHOP INSPECTION.
Except where otherwise specified, procedures for Type I and Type II containers are the same.
WARNING
Wear safety glasses and stand clear of air release ports when purging air from
containers. Make certain air pressure is fully vented before disassembly. Injury
may result from failure to properly vent containers before disassembly.
a. Disassembly.
(1)
If container is closed and sealed, purge pressure following appropriate opening instructions on container.
(2)
Remove and dispose of the pressure safety valve and filler valve from Type I container (see 4.a. (10),
(11). (Fig. 1).
(3)
Remove desiccant port cover/assembly and remove, test and dispose of the breather valve assembly
from Type II container see 4.a. (10), (12).
(4) Remove and dispose of the humidity indicator assembly. (Fig. 1)
(5) Remove nuts, lockwashers and bolts securing upper half of container to lower half of container. (Fig. 2)
(6) Remove and dispose of the container data plate (Fig. 1
(7) Remove and dispose of the sealing gasket from lower half of container. (Fig. 2)
(8) Remove and dispose of the desiccant bags from wire basket. (Fig. 7)
(9) Mark upper/lower halves to ensure matching during reassembly. (Fig. 2)
2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business