| |
- DEPARTMENT OF THE ARMY TECHNICAL BULLETIN
- DANGEROUS CHEMICALS
- DANGEROUS CHEMICALS - CONT
- DANGEROUS CHEMICALS - CONT
- Section I. GENERAL
- Section II. COOLANT CLEANING
- Coolant Fluid Tank (figure 4).
- Figure 3. Coolant system components illustrated (coolant tank, heat exchanger, flow rate, detector, H.V.P.S., XMTR, dummy load)
- Figure 4. Cooling system components illustrated (coolant tank, klystron (MO), klystron (PA).
- Figure 5. Number 10 filter and housing.
- Figure 6. Liquid coolant unit.
- Figure 8. Pressure regulator.
- R.F. Pallet Flow Rate Detector, Power Supplies A1 thru A4, Dummy Load
- Figure 10. Cooling system hook-up flow rate detector XMTR, dummy load and power supplies A1 through A4.
- Waveguide Cleaning.
- Final Rinse:
- Cleaning Station Flowcharts.
- Figure 12. Cleaning station procedure flowchart for RF pallet, flow rate detector, high voltage power supply, high voltage dummy load and heat exchanger unit. (Sheet 1 of 2)
- Figure 12. Cleaning station procedure flowchart for RF pallet, flow rate detector, high voltage power supply, high voltage dummy load and heat exchanger unit. (Sheet 2 of 2)
- Figure 13. Cleaning station procedure flowchart for coolant tank and heating elements. (Sheet 1 of 3)
- Figure 13. Cleaning station procedure flowchart for coolant tank and heating elements. (Sheet 2 of 3)
- Figure 13. Cleaning station procedure flowchart for coolant tank and heating elements. (Sheet 3 of 3)
- THE METRIC SYSTEM AND EQUIVALENTS
- TB-9-1430-1533-40-1
- BLANK PAGE
- By Order of the Secretary of the Army:
- RECOMMENDED CHANGE TO EQUIPMENT TECHNICAL PUBLICATION
|