|
|
SB 740-91-01
Step
Setting and Instructions
Normal Indication
10. Battery Charger Test
(a) Connect PSI, PSM6 and resistors as shown in Figure B-5 below.
(b) Energize PSI and measure
150 + 30 MA
charging current on PSM-6 (Points 1 and 2)
(c) De-energize PS1.
(d) Reconnect PSM6 to points 3 and 4.
(e) Energize PSI and measure
150 + 30 MA
charging current on PSM-6 (Points 3 and 4)
(f) De-energize PS1 and Disconnect equipment.
Figure B-5. Battery Charger Test Setup
II-25
Change 1 B-130.34
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |