|
|
SB 740-91-01
3. Inspection Requirements.
The mechanical-visual inspection defined in coded format in Appendix A-48 for NSN 5960-00-124-9544 (HAC 767H) and
5960-01-011-2698 (HAC 792H) are to be performed in addition to the Electrical Test of paragraph 4.
4. Electrical Tests.
The following tests are to be performed, using the applicable data sheet (figure 3-3) for these TWT's.
Caution
The voltages developed in this control unit are extremely dangerous.
During installation, operation and maintenance, follow the grounding
procedure given in these instructions carefully. It is absolutely necessary
that the ground pin of the input plug be connected to earth ground
through the mating female power-line receptacle.
Step
Setting and Instructions
1
Carefully place the TWT so that the ion pump is easily accessible. Keep the Vac Ion Pump control unit away from
ventilation outlets that might introduce contamination such as dust or corrosive material. Avoid excessively humid
locations.
2
Attach the shield leads (one from the cable assembly and one from the control unit) to the pump body under the
head of a magnet mounting bolt, see Figure B-1. Be sure to make good mechanical and electrical contact.
3
Attach the high voltage cable connector to the ion pump, see Figure B-1.
4
Connect the power cord to the power source receptacle.
5
Place the main power toggle switch in the ON position.
6
To monitor the control unit output voltage, place the Meter Range switch in the 5KV position. The output voltage
will depend on the amount of ion current being drawn; this is shown in Figure B-2.
B-104.2 Change 1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |