Click here to make tpub.com your Home Page

Page Title: Low-Pressure isolation By Bullet Insertion
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-3835-222-BD
f. install the crimped tube on the vehicle.
g. Check that the hydraulic reservoir level is at least at the minimum operating level. If this level
is low, refer to para 8-13 and fill the reservoir as needed.
h. Operate ail hydraulic subsystems (except those that may still be damaged) to remove air from
the system. Check carefully for fluid leaks. Tighten leaking fittings.
i. Check the hydraulic reservoir again to ensure a sufficient hydraulic fluid level. If this level is
low, refer to para 8-13 and fill the reservoir as needed.
j. Record the BDAR action taken.  When the mission is completed, as soon as practicable,
repair using standard maintenance procedures.
8-8.3. Low-Pressure isolation By Bullet Insertion
Limitations:
Correct size bullet must be used.
Personnel/Time Required:
1 soldier 1.0 hr.
Materials/Tools:
Tool Kit
Vise
Blunt Punch
Hacksaw
Deleted.
Change 1 8-23

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business