Click here to make tpub.com your Home Page

Page Title: PMCS PROCEDURES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM5-3655-214-13&P
2-4. PMCS PROCEDURES - Continued
B-Before operation
A-After operation
M-Monthly
D-During operation
W-Weekly
Item
Interval
Item to be
Check for and have repaired
Equipment is not
no.
B
D  AW M
inspected
or adjusted as required
ready/available if:
1
Mounting
Inspect for loose
Mounting hardware
hardware
or missing
is loose or
mounting hardware
missing
Tighten loose
hardware or report
missing hardware
to organizational
maintenance.
2
Hose
Inspect hose con-
connections
nections to
insure they are
tight. Tighten
loose connections.
3
Tailpiece
Inspect and clean
Damaged or missing
filter
filter (Para 3-4)
filter
Notify organza-
tional maintenance
if tailpiece is
missing or
damaged.
4
Electric
Inspect for evidence
Motor is defective
motor
of overheating
(discoloration)
or noisy opera-
tion. Report
defective motor
to organizational
maintenance.
5
V-Belt
Inspect for breaks
V-Belt is defective
frays and proper
tension (Para 3-5)
Report defective
belt to organi-
zational
maintenance.
2-4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business