Click here to make tpub.com your Home Page

Page Title: START PROCEDURE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-3610-254-14
2-17. START PROCEDURE
Starting the System.
a. Set commercial power breaker to ON or start the generator set in accordance with the applicable Department of
the Army Technical Manual.
b. Set all circuit breakers in the main power service box to ON.
c. Set fluorescent light switches to on.
d. Set the air conditioner controls for the desired mode of operation temperature setting.
2-18. SHUTDOWN PROCEDURE
WARNING
Death or serious injury could result if electrical precautions are not taken when maintaining this equipment. Be sure that
power cables are unplugged/disconnected, that circuit breakers are set to OFF and that generator cables are
unplugged/disconnected. Be sure that the generator/commercial power system is properly grounded. Always have
another person standing by who is familiar with electrical shock first aid.
a. Set all equipment and shelter power switches to the off or neutral position.
b. Set all circuit breakers in the main power service box to OFF.
c. Set commercial power breaker to OFF or shut down the generator set power source in accordance with the
applicable Department of the Army Technical Manual.
d. Disconnect the main power cable from the generator power source.
e. Disconnect the cable from the main power receptacle.
f. Coil and correctly stow main power cable.
2-21

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business