Click here to make tpub.com your Home Page

Page Title: Table 5-1. Organizational Preventive Maintenance Checks and Services - Continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 32-5410-215-14&P
Table 5-1. Organizational Preventive Maintenance Checks and Services - Continued
Interval
Item
Item
To Be
Equipment will be reported
No.
W
M
Q
S
A
B
H
MI
Inspected
Procedures
Not Ready (Red) if:
4
EQUIPMENT
Check for missing equipment and equipment
Missing items render RPSF
INVENTORY
sub-assemblies. Replace missing items.
inoperative.
5
MODIFICATIONS
Verify application of all current MWO's.
One or more urgent MWO's
Apply urgent MWO's immediately. When
not applied.
possible,  schedule  normal  MWO's  to
avoid
disrupting operations.
*6a
PRESERVATION
Clean RPSF by removing all accumulated soil such
as dust, dirt, grease and grit.
Inspect all painted surfaces for damage such as
cracked, chipped, flaked, peeled, weathered and
worn paint. Refinish as necessary.
Inspect all surfaces for deterioration such
Surface damage is severe.
as rust, corrosion, and fungus.
*7b
INSTALLATION
Check shelter and its support for stability.
Shelter or support cannot be
AND SUPPORT
Reposition, realign, or resupport shelter
stabilized.
as necessary.
Check shelter support fittings for loose
connections. Tighten as necessary.
a. Preservation procedures may be required more frequently when the RPSF is operated under unusual conditions.
b. Installation and support procedures may be required more frequently when the RPSF is not installed on a solid and level base.
5-4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business