|
|
TM 3-6665-329-13&P
This task covers:
Removal.
a.
Installation.
b.
INITIAL SETUP
Tools:
Electronic equipment tool
kit TK-105/G
a.
Removal.
(1) Remove lid (para 3-11b steps 1 thru 3).
(2) Loosen screw (1) and open cable cover assembly (2).
(3) Remove paddle temperature assembly (3) from housing subassembly by turning
collar counterclockwise.
(4) Remove remaining cables fro CABLE STORAGE compartment.
(5) Remove four screws (4) and Iockwashers (5).
(6)
Lift housing subassemlby (6) from
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |