|
|
TM 3-6665-329-13&P
Installation.
b.
(1) Install bushing (15) and stop (16) with three screws (14).
(2) Install hinge spring bracket (12) with shaft (13) and secure shaft (13), springwasher (11),
Iockwasher (10) with nut (9).
Install flowrate meter bracket (8). Do noth tighten screws.
(3)
(4)
Install three screws (7), Iockwashers (5) and nuts (6).
Install adapter (3) and elbow (2).
(5)
Install nonmetallic tubing assemblies (1).
(6)
(7)
Perform Functional Test No. 9 (table 3-2).
Install front panel (para 3-9c steps 4 thru 8 and 20).
(8)
3-79
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |