Click here to make tpub.com your Home Page

Page Title: Table 3-2. Functional Test Procedures (Cont.)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

ARMY TM 3-6665-329-13&P
AIR FORCE TO 11H2-18-1
Table 3-2. Functional Test Procedures (Cont).
Test
Procedure
No.
Test
d.
Plug PRESSURE TEST tubing (5) with Airflow
9
Pressure Test
(cont)
stop (l).
e.
Connect bellows and pump (4) hose to
PRESSURE PORT.
f.
Open PRESSURE LOCK valve (6) to VERT
position (handle up).
Operate bellows and pump (4) to obtain an
g.
indication of 15 inches of water on
PRESSURE-VACUUM GAGE (7).
h.
Close PRESSURE LOCK valve (6) to HORIZ
position (handle down).
i.
Observe PRESSURE-VACUUM GAGE (7). Reading
should not drop more than 1 inch in 1 min-
ute. If it does, refer to Troubleshooting
paragraph 3-7.2.
Plug flowmeter port (8) with meter
j.
adapter (3).
Change 2
3-28

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business