Click here to make tpub.com your Home Page

Page Title: Table 3-1. Inspection Procedures
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

ARMY TM 3-6665-329-13&P
AIR FORCE TO 11H2-18-1
Table 3-1. Inspection Procedures
Location
Item
Action
Remarks
2.
Panel
a. PRESSURE VACUUM
Check for cracks.
assembly (cont)
GAGE (3), ammeter (4),
and flowmeter (5).
b. Flow adjust valve
Check for cracks or
(6), ALARM TEST
missing knobs.
switch (7) and METER
c. PNEUMATIC LINE
(1) Open cover.
STORAGE compartment
(9).
(2) Check to see that
VACUUM TEST hose and
PRESSURE TEST hose are
not split or cracked.
(3) Close cover.
3-6
Change 2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business