Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM
3-4240-309-20&P
ACTION
LOCATION
ITEM
Red tubing
1. Push red tube coupling nuts (6 and 8) with
Housing  Unit/Power
sleeves on red tube (10). See detail A.
(nonmetallic)
Distribution  Unit
2. Push one end of tube (10) into connector (7)
and one end into connector (9). RED dot on
power distribution unit indicates connector (9).
3. Push red tube coupling nut (6) with sleeve
onto connector (7) and hand tighten.
4. Push red tube coupling nut (8) with sleeve
onto connector (9) and hand tighten.
Push green tube coupling nuts (1 and 3) with
5.
Green tubing
sleeves on green tube (5). See detail A.
(nonmetallic)
Push one end of green tube (5) into connector
6.
(2) and one end into connector (4). GREEN dot
on power distribution unit indicates
connector (4).
7.
Push green tube coupling nut (1) with sleeve
onto connector (2) and hand tighten.
8.
Push green tube coupling nut (3) with sleeve
onto connector (4) and hand tighten.
2-97

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business