Click here to make tpub.com your Home Page

Page Title: TYPICAL CPE CONFIGURATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 3-4240-302-30&P-1
(2) The protective entrance provides a pressurized transition area between the shelter and the outside
contaminated zone. Personnel entering from the outside must wait 5 minutes within the protective entrance
before entering the shelter. Contamination is purged by the flow of filtered air. The PECM automatically ad-
justs the airflow valve and silencer assembly to maintain the proper air pressure inside the protective entrance.
d. CPE System Configurations. Collective protection equipment is configured to fit the needs of a specific
application and may differ from the typical system discussed above.
TYPICAL CPE CONFIGURATION
1-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business