Click here to make tpub.com your Home Page

Page Title: FUNCTIONAL TEST (CONT).
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 3-4240-284-20&P
2-7. FUNCTIONAL TEST (CONT).
INDICATION/REMARKS
LOCATION
ITEM
ACTION
NOTE
Two technicians are needed for this checkout p r o c e d u r e : on the outside of the
p r o t e c t i v e entrance and the other shelter at airflow valve and silencer.
Airflow Valve and  Airflow valve
Make sure that shelter and protec-
Silencer
tive entrance doors are closed.
VALVE AND
SILENCER
L o o s e n hose clamp(26) and re-
move cap (27)from outlet port.
Observe the sliding plate.
The sliding plate (28) will move in a
direction to allow more airflow into
the protective entrance.
R e p l a c e cap(27) on outlet port.
Tighten hose damp (26).
Disconnect cable P15 (29).
Fan and Airflow
Airflow valve
Valve Housing
unit
Hold airduct hose (23) going to the
p r o t e c t i v e entrance and loosen
hose damp (22). Remove airduct
hose.
Skidng plate (24) will move to re-
Reconnect cable P15 (29).
duce airflow into the protective
Replace airduct hose (23). Tighten entrance.
hose damp (22).
Compartment
POWER Switch
Set POWER switch (14) to OFF.
control Module
2-10

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business