Click here to make tpub.com your Home Page

Page Title: DISASSEMBLY
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 3-4230-209-30&P
2-226
2-53. LOW PRESSURE HEATING BOILER ASSEMBLY (CONT).
REMARKS
ACTION
LOCATION/lTEM
Low Pressure Heating
Boiler Assembly/
Remove ignition-combustor cable assembly (6) and nonmetallic
Ignition-combustor cable
grommet (7).
assembly (6)
Nonmetallic grommet (7)
Machine bolts (8)
Internal tooth lock
washers (9)
When handling asbestos material, always wear an air
Combustor assembly (10)
filtering respirator, gloves, and goggles. Wash face and
hands with soap and water before eating or smoking.
Asbestos can cause cancer if handled without protection.
Unscrew and remove eight machine bolts (8) and internal tooth lock
washers (9). Slide out combustor assembly (10).
Remove gasket (11), combustor blower shroud (1 2), and gasket (1 3).
Gasket (11)
Combustor blower
shroud (12)
Gasket (13)

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business