Click here to make tpub.com your Home Page

Page Title: REASSEMBLY
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 3-4230-209-30&P
2-160
2-33. LIQUID FUEL WATER HEATER AND CABINET TOP COVER (CONT).
REMARKS
ACTION
LOCATION/lTEM
Liquid Fuel Water Heater and
Cabinet Top Cover/
WARNING
During lifting operations of the boiler assembly (1), keep in
mind that the refractory box assembly end may have refrac-
tory castable mix installed. This adds greatly to the weight
at a rate of approximately 55 pounds per cubic foot. Make
allowances for the center of gravity.
Use a suitable lifting device to lift boiler assembly (1) onto skid
Boiler assembly (1)
assembly (2), and aline the eight mounting holes. Secure boiler
Skid assembly (2)
Internal tooth lock
assembly (1) with eight internal tooth Iock washers (3) and hexagon head
washers (3)
cap screws (4).
Hexagon head cap
screws (4)

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business