Click here to make tpub.com your Home Page

Page Title: RESSSEMBLY (CONT)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 3-4230-209-20&P
2-188
2-33. CONTROL BOX ASSEMBLY (CONT).
REMARKS
ACTION
LOCATION/ITEM
CAUTION
Do not bend or kink capillary tube. Any damage requires
replacement. Do not coil capillary tube in a coil less than 6
inches in diameter while handling it.
Control Box Assembly/
Screw check valve (19) with preformed packing (20) attached into bottom
Check valve (19)
Preformed packing (20)
of temperature regulating valve (21). Wrap male threads of pipe-to-tube
Temperature regulating
elbow (22) with antiseizing tape before screwing into top of temperature
valve (21)
regulating valve (21). Tighten pipe-to-tube elbow (22) so the open end will
Pipe-to-tube elbow (22)
point directly at the nonmetallic grommet (14). Tighten (do not loosen)
pipe-to-tube elbow (22) to aline. Install temperature regulating valve (21),
pipe-to-tube elbow (22), and check valve (19) as a unit into control box (2).
Selector line (23)
Stick selector line (23) through nonmetallic grommet (14) and screw tube
Tube coupling nuts (24)
coupling nuts (24) onto the pipe-to-tube elbow (22) and pipe-to-tube
tee (13) fingertight.
Hexagon plain nut (25)
Install hexagon plain nut (25) onto end of temperature
regulating valve (21 ) and tighten fingertight. Tighten
two tube coupling nuts (24) and hexagon plain nut (25).
Knob (26)
Install knob (26) with setscrew (27) installed. Tighten
Setscrew (27)
setscrew (27).

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business