Click here to make tpub.com your Home Page

Page Title: REASSEMBLY
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 3-4230-209-20&P
2-126
2-27. SKID MOUNTED DECONTAMINATING APPARATUS TANK UNIT AND REGULATING VALVE (CONT).
REMARKS
ACTION
LOCATION/lTEM
WARNING
Skid Mounted
When regulating valve is replaced, new regulating
Decontaminating Apparatus
When operating drain valve, be careful to prevent injury to
valve must be disassembled (p 2-123) and reassem-
Tank Unit And Regulating
fingers.
bled on the tank unit.
Valve/
Tape all male threads on pipe reducers, pipe elbow,
Pipe reducer (1)
Screw pipe reducer (1) on pipe nipple (2) at bottom of tank unit.
quick disconnect coupling, and pipe nipple with anti-
Pipe nipple (2)
seizing tape before installing them in female threads.
Valve bottom (3)
Screw valve bottom (3) onto pipe reducer (1).
Pipe reducer (4)
Connect pipe reducer (4) with identification
Identification plate (5)
plate (5). Install drive screws (6), pipe
Drive screws (6)
elbow (7), and quick disconnect coupling (8)
Pipe elbow (7)
in valve bottom (3).
Quick disconnect
coupling (8)
Position cross bar support (9) and U-bolt (10)
Cross bar support (9)
U-bolt (10)
so holes aline properly. Install two machine
Machine bolts (11)
bolts (11). Install two lock washers (12) and
Lock washers (12)
two hexagon plain nuts (13). Install two lock
Hexagon plain nuts (13)
washers (14) and two hexagon plain nuts (15)
Lock washers (14)
and tighten until U-bolt (10) is firmly in place.
Hexagon plain nuts (15)

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business