Click here to make tpub.com your Home Page

Page Title: FUEL PUMP PRESSURE ADJUSTMENT PROCEDURES.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM
3-1040-279-12&P
4-12 FUEL PUMP PRESSURE ADJUSTMENT PROCEDURES.
This task covers adjustment of fuel pump.
INITIAL SETUP
Tools
WARNING
General Mechanic's Automotive Tool Kit
SC 5180-90-CL-N26
FUEL SPRAY is very flammable. Do not allow
Test Equipment
open flames, sparks, or heated objects in the
Fuel Test Gage (Fig. G-22, App G)
area during procedure. Point nozzle assem-
bly away from personnel and smoke generator.
Equipment Condition
Vehicle Engine Running
1. Disassemble cover assembly (P. 4-36).
2. Remove cap (1) from FUEL TEST POINT, and attach fuel test gage (Fig. G-22, App G), to fitting
(2).
3. Remove eight screws (3) and washers (4) and remove equipment container panel (5).
4. Set ENGINE switch on terminal bracket assembly to ON.
5. Remove nozzle assembly from engine head.
6. Place nozzle assembly in suitable container to collect fuel.
7. Set circuit breaker CB1, and POWER switch to ON.
8. Hold FUEL switch on control panel to START position until FUEL indicator lights then release
switch to RUN position.
9.  Set ENGINE switch to RUN position. Check fuel test gage. Pressure should be 100 5 psig.
If not:
a. Set control panel switches to OFF.
b. Remove cap nut (6) from fuel pump assembly (8).
c. Turn adjuster (9) clockwise to increase pressure, turn adjuster counterclockwise to reduce
pressure (one turn equals 10 psi).
d. Replace cap nut and repeat steps 7, 8 and 9.
10. After setting pressure, set FUEL, ENGINE, and POWER switches on control panel to OFF.
11. Set circuit breaker CB1 POWER switch, on control panel and ENGINE switch on terminal
bracket to OFF.
12. Remove fuel test gage and install cap.
13. Position equipment container panel (5) and secure with eight screws (3) and washers (4).
14. Reassemble cover assembly (P. 4-37).
4-62
Change 2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business