- GENERAL SUPPORT AND DEPOT MAINTENANCE MANUAL
- General Support and Depot Maintenance Manual
- SAFETY STEPS TO FOLLOW IF SOMEONE IS THE VICTIM OF ELECTRICAL SHOCK
- WARNING
- TABLE OF CONTENTS
- LIST OF ILLUSTRATIONS
- LIST OF ILLUSTRATIONS
- LIST OF ILLUSTRATIONS--Continued
- CHAPTER 1 GENERAL
- Administrative Storage
- CHAPTER 2 FUNCTIONING
- Transmitter Modulator and RF Circuits
- Figure 2-1. Encoder timing diaqram.
- Receiver Section
- Decoder Section
- Error Blanking and Detection
- Figure 2-2. Typical SIF type reply trains.
- Figure 2-3. Single train timing diagram.
- Figure 2-4. Train plus I/P pulse timing diagram.
- Figure 2-5. Two-train timing diagram.
- Power Supply Section
- Figure 28. Typical one-shot circuit.
- Figure 2-10. Typical transistor AND gate circuit.
- Suppression Pulse (P2) Generation
- Transmitter Section, Stage Analysis
- Figure 2-11. Low P2 pulse and main modulator, simplified diagram.
- Decoder Section, Basic Logic Analysis
- Figure 2-12. Receiver section, input and video amplifier, simplified schematic diagram.
- Mode 1 identity and emergency tests
- Error Detection Circuit.
- Readout Circuit
- PIUS 28-Volt Dc Supply, Stage Analysis
- Dc Power Supply Module A14, 150- Volt, Stage Analysis
- CHAPTER 3 TROUBLESHOOTING
- Test Equipment and Tools Required
- Sectionalization Tests
- Sectionalization Tests-CONT.
- Sectionalization Tests Using AN/UPM-98.
- Sectionalization Tests Using AN/UPM-98.-CONT.
- Sectionalization Tests Using AN/UPM-98.-CONT.
- Sectionalization Tests Using AN/UPM-98.-CONT.
- Sectionalization Tests Using AN/UPM-98.-CONT.
- Sectionalization Tests Using AN/UPM-137A.
- Sectionalization Tests Using AN/UPM-137A.-CONT.
- Sectionalization Tests Using AN/UPM-137A.-CONT.
- Sectionalization Tests Using AN/UPM-137A.-CONT.
- Sectionalization Tests Using AN/UPM-137A.-CONT.
- Figure 3-1.1. Power supply test setup using AN/UPM-137A
- Figure 3-1. Power supply test setup.
- Figure 3-2. Transmitter frequency test setup.
- Figure 3-4. Transmitter pulse characteristics test setup.
- Figure 3-5. Receiver and decoder test setup.
- Figure 3-5.1. Receiver and Decodcr test setup using AN/UPM-137A
- Figure 3-6. Test point location.
- Figure 3-7. Adjustmcnt control location.
- Checking Power Supply Section and B+output Circuits for Shorts
- Localizing Troubles
- Localizing Troubles
- Localizing Troubles-CONT.
- Localizing Troubles-CONT.
- Localizing Troubles-CONT.
- Localizing Troubles-CONT.
- Isolating Trouble Within Stage
- Figure 3-8. 12-volt regulator and resistance diagram.
- Figure 3-9. 150-volt power supply voltage and resistance diagram.
- Figure 3-10. Transmitter A16 voltage and resistance diagram.
- Figure 3-11. Encoder module A4 voltage and resistance diagram.
- Figure 3-12. Encoder module A5 voltage and resistance diagram
- Figure 3-13. Decoder module A7 voltage and resistance diagram.
- Figure 3-14. Decoder module A8 voltage and resistance diagram.
- Figure 3-15. Decoder module A9 voltage and resistance diagram.
- Figures 3-16. Decoder module A10 voltage and resistance digram.
- Figure 3-17. Decoder module A11 voltage and resistance diagram.
- Figure 3-18. Decoder module A12 voltage and resistance diagram.
- Figure 3-18. Decoder module A12 voltage and resistance diagram.-CONT./
- IN-CIRCUITRESISTANCE MEASUREMENTS OF MODULE A8
- IN-CIRCUITRESISTANCE MEASUREMENTS OF MODULE A9
- IN-CIRCUITRESISTANCE MEASUREMENTS OF MODULE A11
- IN-CIRCUITRESISTANCE MEASUREMENTS OF MODULE A13
- Out-of-Circuit Transistor Tests
- Dc Resistance of Transformers
- Figure 3-21. Grounded emitter dc gain tests.
- General Instructions
- Test Equipment and Tools Required
- Sectionalization Tests
- Sectionalization Tests-CONT.
- Sectionalization Test Using AN/TPM-25A
- Sectionalization Test Using AN/TPM-25A-cont.
- Sectionalization Test Using AN/TPM-25A-cont.
- Sectionalization Test Using AN/TPM-25A-cont.
- Sectionalization Test Using AN/TPM-25A-cont.
- Sectionalization Test Using AN/TPM-25A-cont.
- Sectionalization Test Using AN/UPM-137A-cont.
- Sectionalization Test Using AN/UPM-137A-cont.
- Sectionalization Test Using AN/UPM-137A-cont.
- Sectionalization Test Using AN/UPM-137A-cont.
- Sectionalization Test Using AN/UPM-137A-cont.
- Figure 3-22. System timing setup using AN/PM-25A.
- Figure 3-23. Transmitter frequency test setup using AN/TPM-25A
- Figure 3-24. Transmitter pulse characteristics test setup using AN/TPM-25A.
- Figure 3-25. Receiver and decoder test setup or video delay and period test using AN/TPM-25A.
- CHAPTER 4 REPAIRS AND ALIGNMENT
- Transmitter Power and Pulse Adjustments
- Transmitter Power and Pulse Adjustments
- Transmitter Power and Pulse Adjustments
- Additional Test Equipment Required
- Receiver Section and Decoder Section Adjustments Using AN/ UPM-137A
- Transmitter Power and Pulse Adjustments
- Receiver Section and Decoder Section Adjustments Using AN/TPM-26A
- Reply Evaluator Adjustment
- CHAPTER 5 GENERAL SUPPORT TESTING
- Figure 5-1. Transmitter frequency test setup
- Transmitter Frequency Test
- Figure 5-2. Transmitter power test setup
- Transmitting Power Test
- Transmitter Output Pulse Test
- Test Equipment Required
- Figure 5-3. Transmitter output pulse test
- Receiver Frequency, Sensitivity and Bandwidth Test
- Receiver Frequency, Sensitivity and Bandwidth Test
- Test Connection and Conditions
- Test Connection and Conditions-cont.
- Test Connection and Conditions-cont.
- Figure 5-4. Receiver and decoder test setup
- Video Enable Delay and T e s t
- Video Enable Delay and Test-cont.
- Figure 5-5. Receiver and decoder test setup using AN/UPM-98
- Decoder Tests
- Decoder Tests-cont.
- Decoder Tests-cont.
- Figure 5-6. Receiver and decoder test setup
- Reply Evaluation Percentage Tests
- Reply Evaluation Percentage Tests-cont.
- Figure 5-7. Reply evaluation percentage test setup using AN/UPM-98
- Figure 5-7.1 Reply evaluation percentage test setup using AN/UPM-137A
- Test Equipment Requested
- Test Connections and Conditions
- CHAPTER 5.1 MODE 4 FUNCTIONING AND MAINTENANCE FOR MODE 4
- Mode 4 Reply Evaluation Section
- Direct rf connection test count.
- Volt Regulator Module A3
- Section II. TROUBLESHOOTING
- Sectionalization
- Sectionalization Tests Using AN/UPM-98
- Sectionalization Tests Using AN/UPM-98-CONT.
- Sectionalization Tests Using AN/UPM-137A
- Sectionalization Tests Using AN/UPM-137A.
- Sectionalization Tests Using AN/UPM-137A-CONT.
- Sectionalization Tests Using AN/UPM-137A.
- Sectionalization Tests Using AN/UPM-137A-CONT.
- Sectionalization Tests Using AN/TPM-25A
- Sectionalization Tests using AN/TPM-25A
- Sectionalization Tests using AN/TPM-25A-CONT.
- Sectionalization Tests using AN/TPM-25A-CONT.
- Sectionalization Tests Using AN/UPM-137A
- Sectionalization Tests Using AN/UPM-137A-CONT.
- Sectionalization Tests Using AN/UPM-137A-CONT.
- Sectionalization Tests Using AN/UPM-137A-CONT.
- Sectionalization Tests Using AN/UPM-137A-CONT.
- Sectionalization Tests Using AN/UPM-137A-CONT.
- Figure 5.1-11. Note 4 timing test setup, using AN/TPM-25A.
- Figure 5.1-12. Mode 4 test connections using AN/TPM-25A.
- Figure 5.1-1. Test point location
- Localizing Troubles
- Mode 4 Module A1 Troubleshooting
- Figure 5.1-3. Module A1 resistance diagram
- Figure 5.1-4. Module A2 resistance diagram.
- Figure 5.1-5. Module A3 voltage and resistance diagram.
- Isolating Trouble Within Stage
- Analysis of Measurements
- Analysis of Measurements-CONT.
- Section III. MODE 4 ALIGNMENT
- Mode 4 Receiver Sensitivity and Reply Video Adjustments Using AN/UPM-137A
- Mode 4 Challenge Video Adjustment
- Section IV. GENERAL SUPPORT TESTING PROCEDURES
- Mode 4 Reply Decoder Tests
- Mode 4 Reply Decoder Tests Using AN/UPM-137A
- Mode 4 Reply Decoder Tests Using AN/UPM-137A-CONT.
- Mode 4 Reply Decoder Tests Using AN/UPM-137A-CONT.
- Mode 4 Reply Decoder Tests Using AN/UPM-137A-CONT.
- Mode 4 Reply Decoder Tests Using AN/UPM-137A-CONT.
- Mode 4 Challenge Video Tests Using AN/UPM-98
- Mode 4 Challenge Video Tests Using AN/UPM-98
- Mode 4 Challenge Video Tests Using AN/UPM-137
- Mode 4 Challenge Video Tests Using AN/UPM-137-CONT.
- Mode 4 Challenge Video Tests Using AN/UPM-137-CONT.
- Figure 5.1-7. Mode 4 test connections.
- Figure 5.1-7.1. Mode 4 Test connections using AN/UPM-137A
- FIGURE 5.1-8. MODULE A1 SOCKET WAVEFORMS
- Figure 5.1-9. Module A2 socket waveforms.
- Figure 5.1-10. Adjustment control locations
- Section V. MODE 4 ALIGNMENT USING AN/TPM-25A
- Mode 4 Receiver Sensitivity and Reply Video Adjustments Using AN/UPM-137A
- Mode 4 Challenge Video Adjustment Using AN/UPM-137A
- Section VI. GENERAL SUPPORT TESTING PROCEDURES DURING MODE 4 OPERATION USING AN/TPM-25A AND AN/U PM-137A
- Mode 4 Reply Decoder Tests
- Mode 4 Reply Decoder Tests-CONT.
- Mode 4 Reply Decoder Tests-CONT.
- Mode 4 Reply Decoder Tests Using AN/ UPM-137A
- Test Connections and Conditions
- Test Connections and Conditions-CONT.
- Test Connections and Conditions.-CONT.
- Test Connections and Conditions.-CONT.
- Mode 4 Challenge Video Tests
- Mode 4 Challenge Video Tests-CONT.
- Mode 4 Challenge Video Tests
- Mode 4 Challenge Video Tests-CONT.
- Mode 4 Challenge Video Tests-CONT.
- CHAPTER 5.2 GENERAL SUPPORT TESTING PROCEDURES USING AN/TPM-25A
- Transmitter Frequency Test
- Transmitter Frequency Test-CONT.
- Figure 5.2-1. System timing setup using AN/TPM-25A.
- Figure 5.2-2. Tmnsmitter frequency test setup using AN/TPM-25A.
- Transmitter Power Test
- Transmitter Output Pulse Test
- Transmitter Output Pulse Test-CONT.
- Figure 5.2-3. Transmitter pulse characteristics test setup using AN/TPM-25A.
- Receiver Frequency, Sensitivity, and Bandwidth Test
- Receiver Frequency, Sensitivity, and Bandwidth Test-CONT.
- Figure 5.2-4. Receiver frequency and bandwidth test setup using AN/TPM-25A.
- Video Enable Delay and Period Test
- Video Enable Delay and Period Test-CONT.
- Figure 5.2-5. Video enable delay and period test setup using AN/TPM-25a.
- Decoder Tests
- Decoder Tests-CONT.
- Reply Evaluation Percentage Tests
- Figure 5.2-6. Reply evaluation percentage tests.
- CHAPTER 6 DEPOT MAINTENANCE
- General Parts Replacement Techniques
- Figure 6-1. Cavity A16A1Z1, exploded view..
- CHAPTER 7 DEPOT OVERHAUL STANDARDS
- Initial Test Procedures Using AN/UPM-137A
- Initial Test Procedures Using AN/UPM-137A-CONT.
- Figure 7-1. Receiver frequency, sensitivity, and bandwidth test setup.
- Receiver Frequency and Bandwidth Using AN/UPM-137A
- Video Enable Delay and Gating Tests
- Comparing Pulse Position Test
- Read Delay, Error Detector, and Function (Controls) Test
- Reply Evaluator Test
- CHAPTER 7.1 D E P O T OVERHAUL STANDARDS USING AN/TPM-25A
- Figure 7.1-1. Depot system timing setup using AN/TPM-25A.
- Figure 7.1-2 Depot overhaul standards basic test setup
- Composition Pulse Position Test
- Read Delay, Error Detector, and Function (Controls) Test
- Reply Evaluator Test
- CHAPTER 8 DIAGRAMS
- Figure 8-0.1. Color code marking for MIL-STD resistors
- Figure 8-0.1. Color code marking for MIL-STD resistors.
- FIGURE 8-1. TEST SET GENERATOR, BLOCK DIAGRAM
- FIGURE 8-2. ENCODER, LOGIC DIAGRAM
- SCHEMATIC DIAGRAM
- FIGURE 8-4. COMPARISON PULSE GENERATOR, LOGIC DIAGRAM
- FIGURE 8-5. ERROR DETECTOR CIRCUIT, LOGIC DIAGRAM
- FIGURE 8-6. POWER SUPPLY SECTION, SCHEMATIC DIAGRAM
- FIGURE 8-7. TRANSMITTER-MODULATOR, SCHEMATIC DIAGRAM
- FIGURE 8-8. ENCODER MODULE A4,SCHEMATIC DIAGRAM
- FIGURE 8-9. ENCODER MODULE A5,SCHEMATIC DIAGRAM
- FIGURE 8-10. DECODER MODULE A7, SCHEMATIC DIAGRAM
- SCHEMATIC DIAGRAM
- FIGURE 8-12. DECODER MODULE A9, SCHEMATIC DIAGRAM
- FIGURE 8-13. DECODER MODULE A10,SCHEMATIC DIAGRAM
- FIGURE 8-14. DECODER MODULE A11,SCHEMATIC DIAGRAM
- FIGURE 8-15. DECODER MODULE A12, SCHEMATIC DIAGRAM
- FIGURE 8-16 FRONT PANEL A15,SCHEMATIC DIAGRAM ( PART 1 OF 2 )
- FIGURE 8-16 FRONT PANEL A15,SCHEMATIC DIAGRAM ( PART 2 OF 2 )
- FIGURE 8-17.ENCODER MODULE A4,TRANSISTOR SOCKET WAVEFORMS
- FIGURE 8-18. ENCODER MODULE,TRANSISTOR SOCKET WAVEFORMS
- FIGURE 8-19. DECODER MODULE A7, TRANSISTOR SOCKET WAVEFORMS
- FIGURE 8-20. DECODER MODULE A9, TRANSISTOR SOCKET WAVEFORMS
- FIGURE 8-21. DECODER MODULE A10, TRANSISTOR SOCKET WAVEFORMS
- FIGURE 8-22. DECODER MODULE A11, TRANSISTOR SOCKET WAVEFORMS
- FIGURE 8-23. DECODER MODULE A12, TRANSISTOR SOCKET WAVEFORMS
- FIGURE 8-24. FRONT PANEL A15, WIRING DIAGRAM (PART 1 OF 4 )
- FIGURE 8-24. FRONT PANEL A15, WIRING DIAGRAM (PART 2 OF 4 )
- FIGURE 8-24. FRONT PANEL A15, WIRING DIAGRAM (PART 3 OF 4 )
- FIGURE 8-24. FRONT PANEL A15, WIRING DIAGRAM (PART 4 OF 4 )
- FIGURE 8-25. TRANSMITTER A16, WIRING DIAGRAM AND PARTS LOCATION ( PART 1 OF 2 )
- FIGURE 8-25. TRANSMITTER A16, WIRING DIAGRAM AND PARTS LOCATION ( PART 2 OF 2 )
- FIGURE 8-26. 12-VOLT REGULATOR MODULE A13, WIRING DIAGRAM AND PARTS LOCATION
- FIGURE 8-27. 150-VOLT POWER SUPPLY MODULE A14,WIRING DIAGRAM AND PARTS LOCATION
- FIGURE 8-28. ENCODER MODULE A4,WIRING DIAGRAM AND PARTS LOCATION
- FIGURE 8-29. ENCODER MODULE A5,WIRING DIAGRAM AND PARTS LOCATION
- FIGURE 8-30. DECODER MODULE A7,WIRING DIAGRAM AND PARTS LOCATION
- FIGURE 8-31. DECODER MODULE A8,WIRING DIAGRAM AND PARTS LOCATION
- FIGURE 8-32. DECODER MODULE A9,WIRING DIAGRAM AND PARTS LOCATION
- FIGURE 8-33. DECODER MODULE A10,WIRING DIAGRAM AND PARTS LOCATION
- FIGURE 8-34. DECODER MODULE A11,WIRING DIAGRAM AND PARTS LOCATION
- FIGURE 8-35. DECODER MODULE A12,WIRING DIAGRAM AND PARTS LOCATION
- FIGURE 8-36. TEST POINT WAVEFORM DIAGRAM
- FIGURE 8-38. MODE 4 SECTION, LOGIC DIAGRAM ( PART 1 OF 2 )
- FIGURE 8-38. MODE 4 SECTION, LOGIC DIAGRAM ( PART 2 OF 2 )
- Fiigure 8-39. 5-volt regulator module A3, block diagram.
- FIGURE 8-40. MODE 4 MODULE A1, SCHEMATIC DIAGRAM ( PART 1 OF 2 )
- FIGURE 8-40. MODE 4 MODULE A1, SCHEMATIC DIAGRAM ( PART 2 OF 2 )
- FIGURE 8-41. MODE 4 MODULE A2, SCHEMATIC DIAGRAM ( PART 1 OF 2 )
- FIGURE 8-41. MODE 4 MODULE A2, SCHEMATIC DIAGRAM ( PART 2 OF 2 )
- FIGURE 8-42. 5-VOLT REGULATOR MODULATOR A3. SCHEMATIC DIAGRAM
- FIGURE 8-43. MODE 4 MODULE A1, PARTS LOCATION DIAGRAM
- FIGURE 8-44. MODE 4 MODULE A2, PARTS LOCATION DIAGRAM
- FIGURE 8-45. 5-VOLT REGULATOR MODULE A3, PARTS LOCATION DIAGRAM
- Figure 8-46. Cable assembly, special purpose, electrical CX12216/APM-123(V) Mschematic diagram.
- APPENDIX REFERENCES
- INDEX
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- TM-11-6625-667-45
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- Distribution
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- DISTRIBUTION
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
- BLANK PAGE
|