Click here to make tpub.com your Home Page

Page Title: INSPECTION REQUIREMENTS-CONT.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

ELECTRICAL
SERVICE
CARD NO.
MAN
WORK
WORK UNIT
7 Day Inspection
INSPECTION
POWER
ON
IN
1-001
MIN
AREA
SYSTEM
SUB-SYS
REQUIREMENTS
J.
With the alligator clip remaining on the ground bar, momentarily touch the
probe to terminal C on the rear of the ALM relay board. FA lamp should
light.
K.
Remove test lead from ground bar. On the front of the Meter and Control
Panel 1A3 place the RECT ACO switch in the vertical position. The RECT
GD lamp should light.
0005
L.
Remove power from one of the three rectifiers (1PS1, 1PS2, or 1PS3) by
placing its AC INPUT circuit breaker in the OFF position. The RFA lamp
should light without generating the external alarm.  Return AC INPUT
circuit breaker to the ON position and place RECT ACO switch to the
horizontal position. Replace protective screen on the back of the rack.
(Cont'd on next card)
T.O. 31W2-4-203-6WC-1
T.M. 11-6130-363-14-1/2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business