Page Title: Section IV. EMERGENCY OPERATION PROCEDURES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 11-5895-833-12/NAVELEX 0967-LP-550-1010/TO 31R5-2TSC54-91
Section IV. EMERGENCY OPERATION PROCEDURES
The C-field and 1 pps of the cesium beam
3-13. Operation with Down-Converter
frequency standard should not be adjusted except
Failure
by direction from NAVOBSY. Instruc-tions and
If a down-converter carrying high-priority traffic fails, an
procedures for the operation and reporting of data
unused down-converter or a down-converter carrying
is contained in NAVOBSY TS/PTTI- O1M.
low-priority traffic may be substituted for the defective
unit as follows:
3-15. Operation with Cesium Beam Frequency
a. Patch substitute down-converter output to output
Standard Failure
line normally used by defective unit.
b. Check to see that proper filter is connected
All communications channel frequency synthesizers are
between connector J2 on rf input stripline assembly and
normally slaved to the 5-MHz standard frequency from
connector J1 on rf conversion stripline assembly (para 3-
the cesium beam frequency standard, providing coherent
9b).
operation. The tracking receiver frequency synthesizer
c. On substitute down-converter front panel, set
1A5 and the test translator are normally driven by their
RECEIVE FREQUENCY SELECTOR MHz and MODE
internal 5-MHz signal sources, providing noncoherent
SELECTOR switches to the same frequency and mode
operation. If the cesium beam frequency standard fails,
settings as on the defective unit.
and coherent operation of the communications channel
d. Perform the procedures outlined in paragraph 3-
frequency synthesizers must be maintained, perform the
9b(4) through (9).
patching operations de-scribed in a below. If the cesium
beam  frequency  standard  fails  and  noncoherent
operation of the com-munications channel frequency
3-14. Operation with Up-Converter Failure
synthesizers  is  permitted,  perform  the  patching
operations described in b be-low.
If an up-converter carrying high-priority traffic fails, an
unused up-converter or an up-converter carrying low-
a. Coherent Operation Patching.
priority traffic may be substituted for the defective unit as
(1)  Disconnect coaxial looping plug connected
follows:
between 2A9 jack J17 and 2A6 jack J18 (fig 3-8)
(2)  Disconnect 50-ohm coaxial termination from
a. Set both up-converter RF OUTPUT switches to
1A5 jack J1 (fig. 3-3).
OFF-LINE.
(3)  Connect patch cord between lA5 jack J1 ((2)
b. Patch substitute up-converter input to input line
above) and 2A6 jack ((1) above) J18.
normally used by defective unit.
b. Noncoherent Operation Patching.
c. Set TRANSMIT FREQUENCY SELECTOR MHz
(1)  Disconnect jumper cable from  frequency
and MODE SELECTOR switches on substitute up-con-
synthesizer EXT STD OUT connector J3.
verter to the same frequency and mode settings as on
(2)  Connect open end of the jumper cable ((1)
the defective unit.
above) to INT STD OUT connector J1.
d. Perform the procedures outlined in paragraph 3-
9a(4) through (10).
NOTE
3-21