Click here to make tpub.com your Home Page

Page Title: CM MMA PC CARD COMPONENT PERFORMANCE TEST
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

T.O. 31S5-4-308-1
TM 11-5805-663-14-13
NAVELEX 0967-464-0010
6-57. After step 6 of table 6-29, load ATP
a . Open front panel (Program Mainte-
tape as follows:
nance Panel).
a . Open Program Maintenance Panel.
b. On Processor Auto-Load PC card
b. On Processor Auto-Load PC card
A1A3A9, set the four red toggle switches,
A1A3A9, set the four red toggle switches,
designated from top to bottom as S1 through
designated from top to bottom as S1 through
S4, as follows: S1 and S2 to up position,
S4, as follows: S1 and S2 to up position,
S3 and S4 to down position.
S3 and S4 to down position.
Mount and thread ATP tape on Mag
Mount and thread ATP tape on Mag
Tape Unit 1 (A1A1).
Tape Unit 1 (A1A1).
d. On Mag Tape Unit, perform the
d. On Mag Tape Unit, perform the
following:
following:
1.
1. Press LOAD switch.
Press LOAD switch.
2. When tape movement stops press
2 . When tape movement stops press
LOAD switch again.
LOAD switch again.
3 .  When LOAD lamp is lighted, press
3. When LOAD lamp is lighted, press
ON LINE switch.
ON LINE switch.
4. If LOAD lamp is not lighted after
4. If LOAD lamp is not lighted after
the tape reel has made five or more revolu-
the tape reel has made five or more revolu-
t i o n s , press REWIND switch; then, when
tions, press REWIND switch; then, when
LOAD lamp lights, press ON LINE switch.
LOAD lamp lights, press ON LINE switch.
e . Press reset and load switches.
e . Press reset and load switches.
f. When tape motion stops, repeat step
f. When tape motion stops, repeat step
e four more times to reach the fifth program
e four more times to reach the fifth program
(GIN 4). Tape motion must stop after each
(GIN 4). Tape motion must stop after each
load.
load.
Press run switch after the fifth load.
g.
g . Press run switch after the fifth load.
NOTE
-NOTE
A loop count will appear in bits 4 to
A loop count will appear in bits 4 to
15 and bit 2 will light to indicate
15 and bit 2 will light to indicate
GIN 4 is operating.
GIN 4 is operating.
h. Go to step 8 of table 6-28.
h. Go to step 8 of table 6-29.
6-56. CM MMA PC CARD COMPONENT
6 - 5 8 .  PCB PC CARD COMPONENT PER-
PERFORMANCE TEST. The component per-
FORMANCE TEST. The component perform-
formance test for the CM MMA PC card is
ance test for the PCB PC card is employed
used to isolate malfunctions to an IC or
to isolate malfunctions to an IC or group of
group of IC`s. To accomplish the CM MMA
IC'S. To accomplish the PCB PC card com-
PC card component performance test perform
ponent performance test perform the proce-
the procedure in table 6-29. If during this
dure in table 6-30.
performance test the malfunction is isolated
to the core memory stack, the entire CM
6 - 5 9 . After step 7 of table 6-30, load ATP
MSA PC card shall be replaced.
tape as follows:

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business