Page Title: Table 2-7. Operating Standards
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

b.  All electric power generating equipment will be
at 100% load for the remaining test as follows:
operated at 50% of the rated load for 1 hour and
Equipment
Size
Desired test
Minimum test
Gen Set 4 hrs
2 hrs 0 thru 10 KW
Gen Set 8 hrs
4 hrs 15 thru 30 KW
Gen Set 16 hrs
8 hrs 45 KW or over
Gen Set 8 hrs
4 hrs Gas Turbine, (All sizes)
NOTE
complish these test (as applicable) to
Operating standards are set forth in
qualify for overseas shipment or
table  2-7  and  equipment  must
transfer between Army activities.
successfully ac-
Table 2-7. Operating Standards
Item
Operating standards
Operate under load to insure proper operation. Observe all gages, controls, and safety devices
refrigeration
for proper operation. Observe all sight glasses and flow gages for proper flow of refrigerant
system, air purifier
and/or lubricant. Observe all drive belts for proper operation. Listen and watch for unusual
air separator, oxygen
noises, excessive vibration, overheating, and loose or missing parts.
pump, CO2 pump,
auxiliary pump,
electric motors,
acetylene generators,
welding machines,
generators, water
purifier
Air system
The system shall develop the required pressure, be drained of accumulated moisture, function
properly, and the leakage rate shall not exceed that stated in the applicable technical manual.
Amphibious vehicles
Operate in water, as well as on land, to prove waterborne operation is satisfactory and that controls
are in proper adjustment. Insure that ramps and other submerged closures are adequate and
that bilge pump and other submerged pumps perform satisfactory.  If, because of local
situation, waterborne operation is not possible, inspect seals carefully and test bilge pump
operation by introducing water into the bilge and pumping it out.
Armament (main
Operate main armament breech mechanism either mechanically or electrically, utilizing
weapon and mount,
dummy round or missile aft cap to determine proper functioning of breech components.
small arms weapons
Remove and inspect mechanical firing mechanism to determine proper condition. Inspect
and mounts, elevating
electrical firing probes, utilizing on-vehicle equipment firing probe tester. Operate small
system, and commander's
arms weapons, utilizing dummy cartridges, to insure proper function of receiver
cupola).
components. Elevate and depress main weapon through full range of movement to insure
proper function of elevating system. Traverse commander's cupola and elevate and depress
machine gun through full range of movement to insure adequate and proper function.
Automatic safety
Insure that all devices operate in the manner intended.
devices
Battery
Insure that battery accepts a charge.
Blower
Operate wheel well blowers in full intended manner (in water if possible) to prove satisfactory
operation of the blower.
Boiler, hot water
Operate under load to insure proper function, inspecting for leaks and adjustments. Inspect and
heater and winterization
operate each generator set winterization system to insure proper heating.
system
Boom, hook block,
Operate all attachments under load in all ranges to prove performance adequate to required
shovel front, back
mission and that there are no broken, unduly worn, inoperative, or maladjusted parts or
hoe, buckets, pile drive,
components and that performance is adequate for intended use. All improper operations
cables, dragline, grader
must be investigated and corrected.
blades, end bits, circle gear,
pinion and rack teeth,
ball joints and caps,
scarifier, teeth, steering
clutch mixer drum,
skip, water discharge,
spreader, vibrator, apron
feeder, strainer, paddle
arms, tamper hopper bars,
power hoist, screed,
agitator revolving frame,
10